"Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. The Cross-Town Tunnels. Paper No. 1158"

| 145 | 947 | 6.5 |
| | | | |
| | | | |
Sept. 6, 1907. |Dec. 4, 1907. | 89 | 603 | 6.8 |
| | | | |
===============+==================+========+============+=============
=====================================================
8
-----------------------------------------------------

Methods and conditions.

-----------------------------------------------------
Top heading and bench. Muck loaded by hand.
" " " " " " " "
Top full-width heading and bench. Muck loaded
by steam shovel. Working exclusively on this
heading.
Top center heading and bench. Muck loaded by
steam shovel. Working alternately in headings
east and west of the shaft.
Top center heading and bench. Muck loaded by
steam shovel. Working alternately in headings
east and west of the shaft.
Top full-width heading and bench. Muck loaded
by steam shovel working exclusively on this
heading.
Exploration drift about 9 ft. by 12 ft. Mucking
by hand. Fourteen timber bents were placed in
March, and seven in April, 1907.